Chapter V – Roads, sandpits and forest infrastructures
Division III – Bridge, culverts, removable structures and rudimentary structures
§6. Special provisions applicable to removable structures and rudimentary structures
Section 112
Removable structures whose supports are located outside the upper limit of the bank must be removed from the watercourse not later than 6 months after their installation in felling or hauling trails or not later than 3 years after their installation in a winter road or a road that will be closed permanently.
The types of removable structures described in the second paragraph of section 111 must be removed from the watercourse at the end of their use, not later than 31 March following their installation or before spring freshet if it occurs before that date, so as to prevent the carrying of sediments into the watercourse and the creation of an ice jam.
1
Objectives
- To avoid carrying sediment into an aquatic, wetland or riparian environment
- To ensure the free flow of water
Additional information
The types of structures referred to in the second paragraph of section 111 are as follows:
- a structure composed of one or more conduits at least 600 mm in diameter installed on the bed of a watercourse and whose fill is composed of tree trunks or snow and covered if needed with a geotextile membrane and granular materials;
- a structure composed of compacted snow or frozen water, covered if needed by a geotextile membrane and granular materials, in particular where there is a risk of carrying sediments into the watercourse;
- an ice bridge, that is a structure composed only of frozen water and reinforced if needed by log mats that are interconnected.
Considering the varying climatic realities that can change from one year to another and from one region to another, any person who installs a removable structure may file a request for an exemption to the Regulation under section 40 of the Sustainable Forest Development Act with the management unit in charge (in French), on a different period than the one from 15 December to 31 March to install and remove removable structures.
Where log mats that are interconnected were used to stabilize the banks, they must be stable and left in place. The granular materials used for the roadway surface near the removable structures that have been removed must be recovered over a distance of at least 20 m, measured from the upper limit of the bank and they must be deposited further than that distance.
2
Objective
- To avoid carrying sediment into an aquatic, wetland or riparian environment
3
Objective
- To avoid carrying sediment into an aquatic, wetland or riparian environment
Figure 112 Timeframe for removing any of the removable structures described in the second paragraph of section 111