GUIDE TO THE APPLICATION OF THE REGULATION RESPECTING THE SUSTAINABLE DEVELOPMENT OF FORESTS IN THE DOMAIN OF THE STATE

 

Complete guide

Training – Quiz 5 Part 1

Chapter V – Part 1 – Roads

0%

Question 1 Section 63.

When work is carried out on a road or road segment, the bridges, culverts, safety devices and road signs on the road must be modified if need be so as to comply with the characteristics of the new class of road.

What type(s) of work are covered by these requirements?

Right answer Wrong answer

Question 2 Section 67.

In places where the soil is impervious hardpan, the distance between the road and the lake or watercourse to be considered for the purposes of the first paragraph must be at least four times the height of the lakeshore or the bank of the watercourse at the level of the natural high water mark, and must not be less than 60 m.

True or false?

Right answer Wrong answer

Question 3 Section 70.

The construction or improvement of a road segment longer than a certain distance is prohibited in an open peat bog, unless the work is carried out to develop a felling or hauling trail, a trail not intended for motorized all-terrain vehicles or a winter road.

What is the distance?

Right answer Wrong answer

Question 4 Section 71.

The maximum width of the right-of-way of a road depends on the class of road.

True or false?

Right answer Wrong answer

Question 5 Section 71.

It is possible to build a road with a right-of-way that is wider than provided for in Schedule 4 of the Regulation, for safety reasons.

True or false?

Right answer Wrong answer

Question 6 Section 76.

During the construction, improvement, repair or maintenance of a road, the water flowing at the foot of the embankments of a road must be diverted regularly.

What distance is required between the diversions?

Right answer Wrong answer

Question 7 Section 79.

What is the minimum diameter of a drainage channel used to divert water from one side of a road to the other?

Right answer Wrong answer

Question 8 Section 79.

What is the required thickness for the fill covering a drainage channel?

Right answer Wrong answer

Question 9 Section 80.

Maintenance work on roads must be carried out in such a way as to prevent sediments from being carried into the aquatic environments, wetlands and riparian environments. Measures must be taken to prevent materials from the roadway surface and abrasives spread on the roadway in winter from covering the stabilized embankments.

True or false?

Right answer Wrong answer

Question 10 Section 81.

In which situation must bridges and culverts be removed?

Right answer Wrong answer

Question 11 Section 82.

A drainage channel may be installed on a winter road and left in place after forestry operations.

True or false?

Right answer Wrong answer

Question 12 Section 84.

A barrier may be installed, on certain conditions, to control access by motorized vehicles to the main building used for boiling the sap in a sugar bush operated for acericultural purposes.

True or false?

Right answer Wrong answer

Quiz 5 Part 1
Completed!
You did not provide the correct answer to one or more of the questions.
If you wish to start over the quiz, click on the "start over" button.