Training
Schedules
Question 1 Schedule 3.
Which ecological type is not on the list of sites having long-term soil fertility problems?
Right answer
Wrong answer
Question 2 Schedules 6 and 7.
Which weighted factor is applied in the calculation method for the peak flow, to take into account exceptional climatic events?
Right answer
Wrong answer
Question 3 Schedule 8.
The diameter required for round conduits changes, for the same flow, according to the burial depth as a percentage of conduit diameter, or according to the presence of outlets in the conduit.
For a drainage basin covering an area of more than 60 km2, what is the required diameter for a circular conduit with a projection wall, based on burial percentage or the presence of outlets, to discharge a flow of 1.52 m3/sec.?
Burial 10% | Burial 20% | Burial 30% | Conduit with outlets | |
a) | 1200 mm | 1400 mm | 1400 mm | 1500 mm |
b) | 1200 mm | 1400 mm | 1600 mm | 1800 mm |
c) | 1200 mm | 1400 mm | 1500 mm | 1500 mm |
Select one of the following answers:
Right answer
Wrong answer
Question 4 Schedule 8.
The diameter required for round conduits changes, for the same flow, according to the burial depth as a percentage of conduit diameter, or according to the presence of outlets in the conduit.
For a drainage basin covering an area of more than 60 km2, what is the required diameter for a circular conduit with a projection wall, based on burial percentage or the presence of outlets, to discharge a flow of 1.60 m3/sec. ?
Burial 10% | Burial 20% | Burial 30% | Conduit with outlets | |
a) | 1200 mm | 1400 mm | 1600 mm | 1800 mm |
b) | 1400 mm | 1400 mm | 1400 mm | 1500 mm |
c) | 1200 mm | 1400 mm | 1400 mm | 1600 mm |
Select one of the following answers:
Right answer
Wrong answer
Question 5 Schedule 8.
The diameter required for round conduits changes, for the same flow, according to the burial depth as a percentage of conduit diameter, or according to the presence of outlets in the conduit.
For a drainage basin covering an area of more than 60 km2, what is the required diameter for a circular conduit with a projection wall, based on burial percentage or the presence of outlets, to discharge a flow of 2.68 m3/sec.?
Burial 10% | Burial 20% | Burial 30% | Conduit with outlets | |
a) | 1600 mm | 1800 mm | 2000 mm | 2000 mm |
b) | 1600 mm | 1600 mm | 1800 mm | 1800 mm |
c) | 1600 mm | 1800 mm | 2000 mm | 2200 mm |
Select one of the following answers:
Right answer
Wrong answer
Question 6 Schedule 9.
How is the slope of a watercourse measured at the crossing site?
Right answer
Wrong answer
Question 7 Schedule 10
Which of the following statements is true?
Right answer
Wrong answer
Question 8 Schedule 10.
How many outlets must be installed in a conduit that is 12 m long?
Right answer
Wrong answer
Question 9 Schedule 10.
How wide must the outlet notch be in a conduit with a diameter of less than 2,200 mm?
Right answer
Wrong answer
Question 10 Schedule 10.
The maximum slope of a watercourse in which a conduit with outlets can be installed is 5% if the length of the conduit is equal to or longer than 15 m.
True or false?
Right answer
Wrong answer
Question 11 Schedule 10.
A culvert with a conduit equipped with outlets can widen the watercourse to comply with the conduit diameter required (Schedule 8) for the peak flow of the watercourse.
True or false?
Right answer
Wrong answer
Question 12 Schedule 10.
The installation slope of a conduit with outlets is greater than the slope of the watercourse.
True or false?
Right answer
Wrong answer
Question 13 Schedule 10.
The minimum diameter of a conduit with outlets is 1,200 mm.
True or false?
Right answer
Wrong answer
Question 14 Schedule 10.
One-site welding and torch cutting of steel elements on conduits and outlets are both forbidden.
True or false?
Right answer
Wrong answer
Question 15 Schedule 11.
The span of a wooden culvert must be less than one metre.
True or false?
Right answer
Wrong answer
Question 16 Schedule 12.
Every intervention on bridges must comply with standard CAN/CSA-S6, Canadian Highway Bridge Design Code, that applies at the time the work is carried out.
True or false?
Right answer
Wrong answer
Question 17 Schedule 13.
What is the criterion for rejection of a cedar log whose ends are affected by rot, expressed as a proportion of the surface of each cut reduced by rot?
Right answer
Wrong answer
Schedules
You did not provide the correct answer to one or more of the questions.
If you wish to start over the quiz, click on the "start over" button.
Completed!